Oil & Gas

4 BMS PACKAGES FOR SOUTH PARS 22, 23 & 24 BOILERS

4 BMS PACKAGES FOR SOUTH PARS 22, 23 & 24 BOILERS

This project includes Burner Management System(BMS) panels,This BMS system has been proposed based on HIMA Automation products. These products provide reliable and efficient solutions for all tasks of process automation. The control unit for this project consists of Four Burner Management Systems (BMS) (Boilers C, D, E, F). The mentioned systems are managed and programmed by HIMA automation software packages. We assure you that HIMA devices and systems for process technology are not only excellently adapted to the dynamics of individual processes, but also guarantee a perfect coordination. As the technologies of our devices and systems are designed for possible extension, they will allow you to profit from future technical chances and possibilities.

 

Ghaleh Jigh Gas Compressor Station, Control system (DCS) based on ABB Freelance 2000, ESD system based on HIMA H41Q

Ghaleh Jigh Gas Compressor Station, Control system (DCS) based on ABB Freelance 2000, ESD system based on HIMA H41Q

Pre-Commissioning and Commissioning of Control System of Ghaleh Jigh Pressure Compressor

JAM  PETROCHEMICAL COMPANY, TWO 132 t/hr WATER TUBE BOILER AND COMMON AUXILIARIES 2 BMS & Common BCS

JAM PETROCHEMICAL COMPANY, TWO 132 t/hr WATER TUBE BOILER AND COMMON AUXILIARIES 2 BMS & Common BCS

This project includes Boiler Management System (BMS) & Boiler Control System (BCS) panel, Industrial Engineering and Operator workstation and all relevant Engineering, Integration, Documentation, FAT, Site Services, Training and Spares.

1 2 3  >>